of the facility (industrial and civil buildings - structures, bridges, tunnels, hydrotechnical structures, highways, airfields, electrical networks and systems (1000 - Medium-pressure, above-ground and below-ground gas pipelines, with pressure: 0.005 kg/cm2 - including 3 kg/cm2. - Second category high-pressure above-ground and below-ground gas pipelines, pressure: 3 k above), technical supervision - inspection of construction works of weak currents, heating-ventilation-cooling networks and systems, water supply, sewerage, drainage networks and systems) 

  • Acquaintance with the presented project documentation 
  • Establishing the concept of inspection
  • Determining the types of tools to be used
  • Technical supervision of the site - to carry out the inspection, the inspection team goes to the site and observes the construction works, takes photographs, conducts measurements and measurements, and documents this information in the form of records
  • The inspection group monitors the progress of construction works, the process of producing documents, the volumes of works performed, the quality and deadlines of construction works, as well as the compliance of materials, products, constructions used in construction with the project, cost estimates, valid documents, technical conditions and makes relevant entries in the inspection log
  • In case of non-conformity of the materials, products, constructions used during the production of construction works with the project, establishes a non-conformity act, makes relevant entries in the inspection log and requires elimination of the non-conformity within the established time frame
  • Comparison of the standard allocations of material costs, auxiliary materials, labor and machine-mechanism resources required for the performed volumes with the object project, cost estimate, normative-technical documents
  • Acceptance of completed construction works and confirmation by signature of the acts of completed works presented by Menard
  • Quality performance control of embroidery arrangement, determination of their compliance with the project and valid documents, photofixation
  • Quality control of hidden works, their compliance with the project and valid documents
  • different actions