engineering networks of the object or its part: electrical networks and systems (up to 1000 and above 1000); Weak currents; Heating-ventilation-cooling networks and systems; Water supply, sewerage, drainage systems; · Gas networks and systems: - medium and low pressure, above-ground and below-ground gas pipelines pressure - 0 kg/cm2 - 0.005 kg/cm2 - inclusive. - Medium-pressure, above-ground and below-ground gas pipelines, with pressure: 0.005 kg/cm2 - including 3 kg/cm2. - Second category high-pressure above-ground and below-ground gas pipelines, pressure: 3 k Primary category high-pressure above-ground and below-ground gas pipelines, with a pressurდან of 6 kg/cm2 - 12 kg/cm2 - including) inspection of the performed construction, repair,დან installation,დან dismantling,დან reconstruction, restoration works 

  • Study of documentation
  • Determining the types of tools to be used
  • Processing of dimensional drawings (if necessary)
  • Visual inspection with the production of photofixation
  • Detailed-instrumental investigation with the production of photofixation
  • Preparation and planning of the inspection facility